1
/
of
3
The One Stop Bathroom Shop
NUIE 1500mm Right Hand Square Shower Bath
NUIE 1500mm Right Hand Square Shower Bath
Regular price
£299.83 GBP
Regular price
Sale price
£299.83 GBP
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.
- bath panel included: No
- colour finish: White
- displaced capacity: 130 l
- guarantee: 5 Years
- legs included: Yes
- material: Acrylic
- number of tap holes: 0
- product depth: 390 mm
- product height: 390 mm
- product length: 1500 mm
- product width: 850 mm
- seat included: No
- shipping load type: Multi-Carton
- slip resistant: No
- volume: 200 l
- waste included: No
Share
