Skip to product information
1 of 3

The One Stop Bathroom Shop

NUIE 1500mm Left Hand Square Shower Bath

NUIE 1500mm Left Hand Square Shower Bath

Regular price £299.83 GBP
Regular price Sale price £299.83 GBP
Sale Sold out
Shipping calculated at checkout.
Quantity

Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.

View full details