Tap Here To Call : 0845 475 0007
Cart 0
NUIE 1600mm Right Hand Square Shower Bath
NUIE 1600mm Right Hand Square Shower Bath
NUIE 1600mm Right Hand Square Shower Bath
The One Stop Bathroom Shop

NUIE 1600mm Right Hand Square Shower Bath

Regular price £299.83 £0.00 Unit price per
Shipping calculated at checkout.

Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.

Bath Panel Included: No
Colour Finish: White
Displaced Capacity: 130 l
Guarantee: 5 Years
Legs Included: Yes
Material: Acrylic
Number Of Tap Holes: 0
Product Height: 390 mm
Product Length: 1600 mm
Product Width: 850 mm
Seat Included: No
Slip Resistant: No
Volume: 200 l
Waste Included: No

x