The One Stop Bathroom Shop
NUIE 1500mm Right Hand Square Shower Bath
Regular price
£299.83
Shipping calculated at checkout.
Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.
Bath Panel Included: No
Colour Finish: White
Displaced Capacity: 130 l
Guarantee: 5 Years
Legs Included: Yes
Material: Acrylic
Number Of Tap Holes: 0
Product Depth: 390 mm
Product Height: 390 mm
Product Length: 1500 mm
Product Width: 850 mm
Seat Included: No
Slip Resistant: No
Volume: 200 l
Waste Included: No