Tap Here To Call : 0845 475 0007
Cart 0
NUIE Shower Bath Front Panel (1800mm)
NUIE Shower Bath Front Panel (1800mm)
The One Stop Bathroom Shop

NUIE Shower Bath Front Panel (1800mm)

Regular price £84.12 £0.00 Unit price per
Shipping calculated at checkout.

High gloss white Acrylic panel. For use with square shower baths. Coordinating bath end panel also available.

Colour Finish: Gloss White
Guarantee: 5 Years
Material: Acrylic
Packaging Height: 35.0000 mm
Packaging Length: 1720.0000 mm
Packaging Width: 515.0000 mm
Product Depth: 167 mm
Product Height: 500 mm
Product Width: 1800 mm

x