Tap Here To Call : 0845 475 0007
Cart 0
NUIE Shower Bath End Panel (700mm)
NUIE Shower Bath End Panel (700mm)
NUIE Shower Bath End Panel (700mm)
The One Stop Bathroom Shop

NUIE Shower Bath End Panel (700mm)

Regular price £70.01 £0.00 Unit price per
Shipping calculated at checkout.

High gloss white Acrylic panel. For use with square shower baths. Coordinating bath front panel also available.

Colour Finish: European White
Guarantee: 5 Years
Material: Acrylic
Packaging Height: 502.0000 mm
Packaging Length: 40.0000 mm
Packaging Width: 710.0000 mm
Product Depth: 26 mm
Product Height: 500 mm
Product Width: 700 mm

x