The One Stop Bathroom Shop
NUIE 1700 sq showerbath front panel cw fixing
Regular price
£84.12
Shipping calculated at checkout.
High gloss white Acrylic panel. For use with square shower baths. Coordinating bath front panel also available
Colour Finish: European White
Guarantee: 5 Years
Material: Acrylic
Packaging Height: 555.0000 mm
Packaging Length: 47.0000 mm
Packaging Width: 1015.0000 mm
Product Depth: 150 mm
Product Height: 500 mm
Product Width: 1700 mm