The One Stop Bathroom Shop
NUIE 1500mm square showerbath front panel
Regular price
£84.12
Shipping calculated at checkout.
High gloss white Acrylic panel. For use with square shower baths. Coordinating bath end panel also available.
Colour Finish: White
Guarantee: 5 Years
Material: Acrylic
Packaging Height: 555.0000 mm
Packaging Length: 47.0000 mm
Packaging Width: 1015.0000 mm
Product Depth: 150 mm
Product Height: 500 mm
Product Width: 1500 mm